✦ Now in Active Development

Airport Operations
Powered by Intelligence

TerminalIQ gives airport planners a single platform to optimize gate assignments, grade Level of Service against IATA ADRM standards, model future scenarios, and produce stakeholder-ready reports — all from a flight schedule CSV.

100%IATA ADRM Aligned
8Analytical Modules
Scenarios Testable
DFW Summer 2025
Setup
Schedule
Gating
Analytics
184
Total Flights
↑ +12 from base
78%
Gate Utilization
↑ Optimal
42m
Avg Turn Time
▲ 3m buffer
3
Overflow Gates
△ Review needed
1
Conflicts
⚠ Gate B7
06:00
08:00
10:00
12:00
14:00
16:00
A1
A2
B3
B4
C6
C7
6
IATA LoS Functions Graded
Check-in · Security · Holdroom · Passport · Baggage · FIS
Real-time
Gate Re-optimization
Drag-and-drop with instant Hungarian algorithm resolve
Scenario Variants
Growth %, time shifts, airline entry/exit, maintenance
AI
Natural Language Engine
Coming Phase 5 — ask "What if Delta adds 6 morning flights?"

Every tool an airport planner needs,
in one intelligent platform

From raw CSV to boardroom-ready reports. TerminalIQ automates the analysis that used to take weeks of spreadsheet work.

Automated Gate Assignment

Upload a flight schedule CSV and TerminalIQ's constraint-based optimization engine (Hungarian algorithm) instantly assigns every aircraft to the optimal gate — respecting airline preferences, aircraft type, FIS requirements, and maintenance windows.

● Live

IATA ADRM Level of Service Grading

Automatically calculate A–F grades for check-in, security, holdroom, passport control, baggage claim, and FIS/customs. Includes M/M/c queuing models, space deficit/surplus analysis, and hour-by-hour LoS heatmaps.

● Live

Scenario Builder & Stress Testing

Model any future state: apply growth percentages, time shifts, airline additions or removals, and gate closures. Compare Base vs Scenario A vs Scenario B side-by-side with automatic green/red performance deltas.

● Live
📈

Rolling-Hour Analytics

Visualize gate utilization, arrivals/departures, seat and passenger flows by hour. Detect hub bank structure and wave patterns. Filter by airline or terminal to isolate problem periods with precision.

▲ Phase 3
🗺

Live GIS Airport Map

Upload your SVG floor plan and watch gate status animate in real time. Gate circles color by availability, LoS zones shade by grade, and a time scrubber lets you replay any moment in the operating day. GeoJSON-ready for ArcGIS handoff.

▲ Phase 4
🚨

Capacity Ceiling & Investment Prioritization

Plot the growth percentage at which each terminal function hits LoS-D. Automatically rank infrastructure priorities: "Check-in hall fails at +18% growth — 3.2 years at current trajectory." Know exactly where to invest before capacity becomes a crisis.

▲ Phase 4
🔀

OTP Risk & Disruption Resilience

Flag flights with on-time performance risk before they cascade. Simulate delay events across your schedule and receive a resilience score showing how many gates break under disruption. Plan buffer strategies with data, not gut feel.

▲ Phase 3
📄

Stakeholder PDF Reports

Export publication-ready PDF reports with Gantt charts, LoS grade summaries, capacity curves, and scenario comparisons. No reformatting needed — go straight from analysis to boardroom presentation.

▲ Phase 4
🤖

AI Natural Language Planner

Ask TerminalIQ anything in plain English: "What if Southwest upgauges all 737-700s to MAX 8s — what breaks?" The AI agent runs the optimization, grades LoS, and surfaces the key constraints — no spreadsheets required.

★ Phase 5 — AI

IATA ADRM grading for
every terminal function

TerminalIQ calculates A–F grades in real time as your schedule changes. See exactly when and where your terminal exceeds IATA Level of Service thresholds — and how long it stays there.

📊 LoS Grades — DFW Terminal D · Peak Hour 08:00–09:00
Gate Holdroom
2.8 m²/pax · 420 seats available
A
Security Screening
4 lanes · 8.2 min avg queue
B
FIS / Customs
6 booths · 11.4 min wait
B
Check-in Hall
18 desks · 22.1 min avg queue
D
Baggage Claim
1,200 m² · 1.1 m²/pax deficit
D
Passport Control
3 booths · 38.4 min wait
F

Hour-by-hour LoS Heatmap

See exactly which functions struggle at peak — and for how long. The heatmap reveals the true duration of poor service, not just the peak moment.

⏱ LoS Timeline · All Functions · 05:00–22:00
Check-in
A
B
D
D
C
B
C
D
B
A
A
A
Security
A
A
B
C
B
A
B
C
A
A
A
A
Holdroom
A
A
A
A
A
A
A
A
A
A
A
A
Passport
A
B
D
F
D
C
D
F
C
B
A
A
Baggage
A
A
C
D
C
B
C
D
B
A
A
A
05h07h09h11h 13h15h17h19h 20h21h21h22h

Rolling-hour intelligence
for every operational metric

See your airport's rhythm. TerminalIQ surfaces gate utilization, passenger flows, bank structures, and seat capacity by the hour — with airline and terminal filters built in.

📊 Rolling-Hour Operations Dashboard — DFW · All Airlines · All Terminals
Utilization
Passengers
Operations
Banks
Gate Utilization %
78%
06h — 22h local time
Departing Passengers / hr
4,820
Peak: 14:00–15:00 · 4,820 pax
Arrivals + Departures / hr
38 ops
Arrivals
Departures

Test any future state
before it becomes reality

TerminalIQ's Scenario Builder lets planners rapidly model growth, schedule shifts, new airline entries, and infrastructure constraints — then compare results instantly.

⚡ Scenario Builder — Summer 2027 Growth Model
Traffic Growth
+18%
Schedule Time Shift
+30 min
New Airline Entrant
B6 (JetBlue)
Gates in Maintenance
B7, C4
⚠ LoS Impact Preview
Check-in LoS B → F ↓
Overflow Gates 3 → 11 ↑
Gate Utilization 78% → 94% ↑

SCENARIO COMPARISON TABLE

Metric
Base
Scenario A
Scenario B
Total Flights
184
217 ↑
201 ↑
Gate Utilization
78%
94% ↑
85%
Overflow Gates
3
11 ↑
5
Check-in LoS
B
F ↓
D ↓
Security LoS
B
D ↓
C
Overall LoS
B
F ↓
D ↓
⚠ Scenario A Critical Alert
Check-in hall becomes a chokepoint at +18% growth. Passport control already at LoS-F during morning peak. Infrastructure investment required before 2027 schedule.

Your floor plan, alive with
real-time operational data

Upload any SVG floor plan and TerminalIQ overlays live gate status, LoS zone shading, and a time-scrubber that lets you replay the entire operating day. GeoJSON-ready for direct ArcGIS and Mapbox integration.

🗺 GIS Live Map — DFW Terminal D · 09:30 local
Time scrubber 09:30
CHECK-IN · LoS A
SECURITY · D
PASSPORT
CTRL · F
CONCOURSE D — 28 GATES
A1
A2
B3
B4
B5
B7
C1
C2
C3
D1
D2
D3
D4
D5
E1
E2
E3
Available
Occupied / Busy
Conflict / Overflow
LoS Zone Grade A
LoS Zone Grade D
LoS Zone Grade F
🔗 GeoJSON export ready for ArcGIS / Mapbox

Know when your infrastructure
will fail — before it does

TerminalIQ's Capacity module maps the exact growth percentage at which every terminal function hits LoS-D, ranks investment priorities by urgency, and models the impact of new airline entrants.

📈

LoS Saturation Curves

See exactly where each terminal function reaches its LoS-D breaking point under growth.

Passport Ctrl
+5%
Check-in
+18%
Baggage Claim
+25%
Security
+32%
Holdroom
+45%

Infrastructure Priority List

Automatically ranked by urgency — which function fails first and when.

CRITICAL · Passport Control
Hits LoS-D at +5% growth (~0.9 years)
HIGH · Check-in Hall
Hits LoS-D at +18% growth (~3.2 years)
MEDIUM · Baggage Claim
Hits LoS-D at +25% growth (~4.5 years)
LOW · Holdroom Space
Hits LoS-D at +45% growth (~8.1 years)

Airline Entry / Exit Modelling

Simulate any new airline entering your market or an existing one reducing service.

ENTRY SCENARIO: JetBlue adds DFW base
New daily flights +24 ops
Gates required +4 gates
Peak hour impact +610 pax/hr
Check-in LoS change B → D

From flight schedule to
boardroom report in minutes

01

Upload Your Schedule

Drag and drop your flight schedule CSV. TerminalIQ's pairing engine automatically matches arrival and departure legs, flags conflicts, and prepares the schedule for optimization. Supports any IATA-standard format.

02

Optimize & Analyze

The constraint-based gate assignment algorithm runs in seconds — assigning aircraft to gates while respecting FIS requirements, maintenance windows, airline preferences, and buffer times. Full IATA LoS grading follows automatically.

03

Model, Compare, Report

Build unlimited scenarios, compare them side-by-side, identify capacity ceilings, and export publication-ready PDF reports and Gantt charts for stakeholders, airline partners, and regulatory submissions.

★ Coming Phase 5 — AI Natural Language Engine

Just ask. TerminalIQ answers.

The Phase 5 AI assistant lets planners interact with their schedule in plain English. No more clicking through menus — just ask the question.

// Example natural language queries
> "What if Delta adds a morning bank of 6 flights?"
→ Running optimization... Gate utilization rises to 91%. Check-in LoS drops to C. 2 overflow gates required. Recommend staggering 08:15–09:00 bank.
> "Southwest wants to upgauge all 737-700s to MAX 8 — what breaks?"
→ 14 gates affected. 3 incompatible gate sizes. Holdroom capacity deficit: 240 seats at peak. Boarding time model updated.

Ready to transform your
airport planning?

TerminalIQ pricing is tailored to your airport's scale. Contact us for a demo, custom pricing, enterprise deployment, or technical integration support.

🛫
Pricing Inquiry
Flexible plans for regional airports, hubs, and airport authorities. Volume licensing available.
📊
Request a Live Demo
See TerminalIQ in action with your own schedule data. 30-minute sessions available.
🔗
Integration & API Access
Connect TerminalIQ to your existing ArcGIS, AODB, or airport management systems.
🤝
Partnership & Consulting
Work with our team on custom ADRM analysis, capacity studies, and master planning support.
✦ Or launch directly

TerminalIQ is available now at terminaliq.vercel.app. Sign in to create your first session and upload a schedule today.

Launch the App ↗
Send us a message
We typically respond within one business day.
Messages are delivered to briantgaul@gmail.com. No spam — ever.
✓ Message sent! We'll be in touch within one business day.