✦ Now in Active Development

Airport Operations
Powered by Intelligence

TerminalIQ gives airport planners a single platform to optimize gate assignments, run Level of Service grading against IATA ADRM standards, model future scenarios, and produce stakeholder-ready reports — all from an easy flight schedule import.

100%IATA ADRM Aligned
8Analytical Modules
Scenarios Testable
DFW Summer 2025
Setup
Schedule
GateIQ
Analytics
184
Total Flights
↑ +12 from base
78%
Gate Utilization
↑ Optimal
42m
Avg Turn Time
▲ 3m buffer
3
Overflow Gates
△ Review needed
1
Conflicts
⚠ Gate B7
06:00
08:00
10:00
12:00
14:00
16:00
A1
A2
B3
B4
C6
C7
6
IATA LoS Functions Graded
Ticketing · Security Screening · Holdrooms · Passport Control · Baggage · Curbside
Real-time
Gate Optimization
Drag-and-drop flights or simulate gate closures
Scenario Variants
Test future growth, new airline entrants, maintenance impacts
AI
Embedded AI Assistant
Stress-test your airport against every possible scenario

Every tool an airport planner needs,
in one intelligent platform

From raw schedules to boardroom-ready reports. TerminalIQ automates the analysis that used to take weeks of spreadsheet work, and integrates with the broader AirportIQ Solutions product family.

GateIQ Assignment Engine

Upload a flight schedule or import directly from OAG and TerminalIQ's GateIQ optimization engine instantly assigns every aircraft to the optimal gate while respecting airline preferences, aircraft type, FIS requirements, and maintenance windows.

● Live

TerminalIQ ADRM Grading

Automatically calculate A–F grades for Ticketing, Security Screening, Holdrooms, Passport Control, Baggage Handling and Vehicle Curbside and Parking. Includes M/M/c queuing models, space deficit and surplus analysis, and hour-by-hour Level of Service heatmaps.

● Live

Scenario Builder & Stress Testing

Model any future state: apply growth percentages, time shifts, airline additions or removals, and gate closures. Compare Base vs Scenario A vs Scenario B side-by-side with automatic green/red performance deltas.

● Live
📈

EnterpriseIQ Analytics

Visualize gate utilization, arrivals and departures, seat and passenger flows by hour. Detect hub bank structure and wave patterns. Filter by airline or terminal to isolate problem periods with precision.

▲ Phase 3
🚨

EnterpriseIQ Capacity & Investment Prioritization

Plot the growth percentage at which each terminal function hits LoS-D. Automatically rank infrastructure priorities: "Ticketing fails at +18% growth — 3.2 years at current trajectory." Know exactly where to invest before capacity becomes a crisis.

▲ Phase 4
🗺

Live GIS Airport Map

See how each part of your terminal functions throughout the day overlaid directly onto a floor plan. Ready for direct ArcGIS and Mapbox integration with Facility Condition data.

▲ Phase 4
🔀

OTP Risk & Disruption Resilience

Flag flights with on-time performance risk before they cascade. Simulate delay events across your schedule and receive a resilience score showing how many gates break under disruption. Plan buffer strategies with data, not gut feel.

▲ Phase 3
📄

Stakeholder PDF Reports

Export publication-ready PDF reports with Gantt charts, LoS grade summaries, capacity curves, and scenario comparisons. Go straight from analysis to boardroom presentation.

▲ Phase 4
🤖

EnterpriseIQ Assistant

Ask TerminalIQ anything in plain English: "What if Southwest upgauges all 737-700s to MAX 8s — what breaks?" The EnterpriseIQ assistant runs the optimization, grades Level of Service, and reveals the key constraints — no spreadsheets required.

★ Phase 5 — AI

IATA ADRM grading for
every terminal function

TerminalIQ calculates A–F grades in real time as your schedule changes. See exactly when and where your terminal exceeds IATA ADRM service thresholds — and how long it stays there.

📊 LoS Grades — Your Terminal · Peak Hour 08:00–09:00
Gate Holdroom
2.8 m²/pax · 420 seats available
A
Security Screening
4 lanes · 8.2 min avg queue
B
Vehicle Curbside
460 feet · 18.4 vehicles waiting
B
Ticketing
18 desks · 22.1 min avg queue
D
Baggage Claim
1,200 m² · 1.1 m²/pax deficit
D
Passport Control / FIS
3 booths · 38.4 min wait
F

Hour-by-hour LoS Heatmap

See exactly which functions struggle at peak — and for how long. The heatmap reveals the true duration of poor service, not just the peak moment.

⏱ LoS Timeline · All Functions · 05:00–22:00
Ticketing
A
B
D
D
C
B
C
D
B
A
A
A
Security
A
A
B
C
B
A
B
C
A
A
A
A
Holdroom
A
A
A
A
A
A
A
A
A
A
A
A
Passport
A
B
D
F
D
C
D
F
C
B
A
A
Baggage
A
A
C
D
C
B
C
D
B
A
A
A
05h07h09h11h 13h15h17h19h 20h21h21h22h

Rolling-hour intelligence
for every operational metric

See your airport's rhythm. TerminalIQ provides insight into gate utilization, passenger flows, bank structures, and seat capacity by the hour — with airline and terminal filters built in.

📊 Rolling-Hour Operations Dashboard — Your Airport · All Airlines · All Terminals
Utilization
Passengers
Operations
Banks
Gate Utilization %
78%
06h — 22h local time
Departing Passengers / hr
4,820
Peak: 14:00–15:00 · 4,820 pax
Arrivals + Departures / hr
38 ops
Arrivals
Departures

Test any future state
before it becomes reality

EnterpriseIQ lets planners rapidly model growth, schedule shifts, new airline entries, and infrastructure constraints — then compare results instantly.

⚡ Scenario Builder — Summer 2027 Growth Model
Traffic Growth
+18%
Schedule Time Shift
+30 min
New Airline Entrant
B6 (JetBlue)
Gates in Maintenance
B7, C4
⚠ LoS Impact Preview
Ticketing B → F ↓
Overflow Gates 3 → 11 ↑
Gate Utilization 78% → 94% ↑

SCENARIO COMPARISON TABLE

Metric
Base
Scenario A
Scenario B
Total Flights
184
217 ↑
201 ↑
Gate Utilization
78%
94% ↑
85%
Overflow Gates
3
11 ↑
5
Ticketing
B
F ↓
D ↓
Security
B
D ↓
C
Overall LoS
B
F ↓
D ↓
⚠ Scenario A Critical Alert
Ticketing becomes a chokepoint at +18% growth. Passport control already sits at LoS-F during the morning peak. Infrastructure investment is required before the 2027 schedule.

Your floor plan, alive with
real-time operational data

See how each part of your terminal functions throughout the day overlaid directly onto a floor plan. Ready for direct ArcGIS and Mapbox integration with Facility Condition data.

🗺 GIS Live Map — Your Airport · 09:30 local
Time scrubber 09:30
Ticket Counters
Security Lanes
Holdroom Space
TICKETING · A
SECURITY · D
HOLDROOM · B
HOLDROOM A/B
CENTRAL CONCOURSE
HOLDROOM C/D
A1
A2
B3
B4
B5
B7
C1
C2
C3
D1
D2
D3
D4
D5
REMOTE APRON
E1
E2
E3
Available
Occupied / Busy
Conflict / Overflow
LoS Zone Grade A
LoS Zone Grade D
LoS Zone Grade F
🔗 GeoJSON export ready for ArcGIS / Mapbox

Know when your infrastructure
will fail — before it does

EnterpriseIQ maps the exact growth percentage at which every terminal function reaches suboptimum level of service, ranks investment priorities by urgency, and models the impact of new airline entrants.

📈

LoS Saturation Curves

See exactly where each terminal function reaches its LoS-D breaking point under growth.

Passport Ctrl
+5%
Ticketing
+18%
Baggage
+25%
Security
+32%
Holdrooms
+45%

Infrastructure Priority List

Automatically ranked by urgency — which function fails first and when.

CRITICAL · Passport Control
Hits LoS-D at +5% growth (~0.9 years)
HIGH · Ticketing
Hits LoS-D at +18% growth (~3.2 years)
MEDIUM · Baggage Claim
Hits LoS-D at +25% growth (~4.5 years)
LOW · Holdroom Space
Hits LoS-D at +45% growth (~8.1 years)

Airline Entry / Exit Modelling

Simulate any new airline entering your market or an existing one reducing service.

ENTRY SCENARIO: JetBlue adds base
New daily flights +24 ops
Gates required +4 gates
Peak hour impact +610 pax/hr
Ticketing change B → D

From flight schedule to
boardroom report in minutes

01

Upload Your Schedule

Drag and drop your flight schedule or import directly from OAG. TerminalIQ's pairing engine automatically matches arrival and departure legs, flags conflicts, and prepares the schedule for GateIQ optimization. Supports any IATA-standard format.

02

Optimize & Analyze

The GateIQ assignment engine runs in seconds while respecting FIS requirements, maintenance windows, airline preferences, and buffer times. Full TerminalIQ grading follows automatically.

03

Model, Compare, Report

Build unlimited scenarios, compare them side-by-side, identify capacity ceilings, and export publication-ready PDF reports and Gantt charts for stakeholders, airline partners, and regulatory submissions.

★ Coming Phase 5 — AI Natural Language Engine

Just ask. EnterpriseIQ answers.

The Phase 5 EnterpriseIQ assistant lets planners interact with their schedule in plain English. No more clicking through menus — just ask the question.

// Example natural language queries
> "What if Delta adds a morning bank of 6 flights?"
→ Running optimization... Gate utilization rises to 91%. Ticketing drops to C. 2 overflow gates required. Recommend staggering the 08:15–09:00 bank.
> "Southwest wants to upgauge all 737-700s to MAX 8 — what breaks?"
→ 14 gates affected. 3 incompatible gate sizes. Holdroom capacity deficit: 240 seats at peak. Boarding time model updated.

Ready to transform your
airport planning?

TerminalIQ is one of several airport planning applications developed by AirportIQ Solutions. Contact us at contact@airportiqsolutions.com for a demo, custom pricing, enterprise deployment, or technical integration support.

🛫
Pricing Inquiry
Flexible plans for regional airports, hubs, and airport authorities. Volume licensing available.
📊
Request a Live Demo
See TerminalIQ in action with your own schedule data. 30-minute sessions are available.
🔗
Integration & API Access
Connect TerminalIQ to your existing ArcGIS, AODB, or airport management systems.
Direct Contact
Reach AirportIQ Solutions directly at contact@airportiqsolutions.com.
🤝
Partnership & Consulting
Work with our team on custom ADRM analysis, capacity studies, and master planning support.
✦ Or launch directly

TerminalIQ is available now at terminaliq.airportiqsolutions.com with a free tier to test the services for yourself.

Launch the App ↗
Send us a message
✓ Message sent! We'll be in touch within one business day.